Sign In | Join Free | My entremaqueros.com |
|
Brand Name : HD Boiler
Model Number : Air Preheater
Certification : ISO9001,ASME,Grade A,SGS,EN
Place of Origin : China
MOQ : 1Set
Price : Negotiable
Payment Terms : L/C, T/T, Western Union, D/P, MoneyGram
Supply Ability : 300 Tons/Month
Delivery Time : Within 30 Days
Packaging Details : Seaworthy Packing
Condition : New
Structure : Fire/Water Tube
Fuel : Coal/Gas/Coal-fired/Water heat
Type : Pressure Parts
Pressure : Low/High Pressure
Range of Applications : Industrial/Power Station
Specification : Customized
Surface Treatment : Painted
Style : Horizontal and Vertical
Trademark : HDB
HS Code : 3215960855
80 Ton Gas Boiler Part Air Preheater Heat Exchanger Enamel Tube In Thermal Power Plant
Product Description
The purpose of the air preheater is to recover the heat from the flue gas(exhaust gases) from the boiler to improve boiler efficiency. Incidentally the gases are sent to the chimney or stack at lowered temperature so that the design of the ducting and the stack becomes simplified. Also it controls the temperature of gases coming out of the stack.
Different types
For the use in Steam Generators (boilers)in Thermal power stations of Utility power stations, there are two types of design of the Airpreheaters. One is a tubular type built into the boiler outlet Flue_gas ducting and another one is of the regenerative type known as Ljungstrom (named after the name of inventor) Regenerative Air Pre Heater(RAPH),a rotating type. This may be horizontal (now very common in power generation utilities) or vertical.
Parameter
Layout item | Horizontal layout | Vertical layout |
Tube arrangement | staggered arrangement / in-line arrangement | staggered arrangement / in-line arrangement |
Sealing of pipe and plate | Packing heat- resistant material/ welding | welding |
Anti-wearing | a,when gas scours external tube, welcoming smoke tubes have protective tile b,when gas scours inside tube,wear casing pipes are installed in gas inlet. |
Product advantages
1. High corrosion resistance property;
2. Small covering area;
3. Pipe and tube plate in every link between separated, the heated bilges cold heat distortion is not bound to avoid stress destruction;
4. Single pipe, tube single or parts of equipment failure does not affect the heat normal operation, two fluid were heat tube, can go outside fin
Workshop
Certifications
Company Information
Fabrication area of 200,000 square meters
150 Engineers
600 Coded welders
60 Licensed Inspectors (including NDT level-lll instructors)
Grade-ALicenses for Design and Manufacture boiler (issued by the State Administration of Quality Supervision and Inspection)
ISO 90001:2008 Quality System
ASME Certificate of Utility Boiler
ASME‘S’ , ‘U’ and NB stamp authorization
![]() |
80 Ton Gas Boiler Spare Parts , Tubular Ste Am Air Preheater For Boiler Images |